Key Dates
24 October → 06 November 2019
Online Public Engagement
This online engagement session is being provided to have an additional opportunity to provide feedback on the developed route alignment concepts for the greenway extensions at both the Bedford and Lower Sackville ends of the existing corridor. The information gathered will be used to help decide which options to continue for further design.
23 October 2019
Public Open House #2
This round of public engagement was held to gather feedback on the developed route alignment concepts for the greenway extensions at both the Bedford and Lower Sackville ends of the existing corridor. The information gathered will be used to help decide which options to continue for further design.
10 September → 27 September 2019
Online Survey
This survey was provided to collect information on current facility usage, user experience and to gain insight on the priorities for the future connections of the Bedford-Sackville Greenway Corridor.
This information was used to aid in the development of route alignment concepts for the extensions of the greenway facility and to inform on how the existing sections of the corridor could be improved.
This information was used to aid in the development of route alignment concepts for the extensions of the greenway facility and to inform on how the existing sections of the corridor could be improved.